Wednesday, 14 October 2026 नेपाली
नेपाली

Beni-Jomsom road blocked: over 2,500 EVs that entered via Korala stuck in Mustang

· 1 min readनेपालीमा पढ्नुहोस्
Beni-Jomsom road blocked: over 2,500 EVs that entered via Korala stuck in Mustang
Photo: नेपाल प्रेस

It has become difficult to move the electric vehicles (EVs) that entered through Mustang's Korala border point to their destinations.

The Beni-Jomsom road was blocked by floods, landslides and river erosion caused by heavy rainfall on Asoj 11. In the two weeks since the road was blocked, more than 2,500 electric vehicles have entered Nepal through the Korala border point.

Saying the road is not yet fully passable, the officials concerned said they have been unable to move the vehicles on to their destinations, leaving them stranded in Mustang.

Latest bulletin

के हुँदैछ डेली | आजका मुख्य समाचार | २८ असोज २०८३ बिहानी | K Hudei Cha Daily News Asoj 28 2083

Subscribe on YouTube

Sources

Related stories